​All Eagle Valley Library District locations will be closed Monday, September 23 for a Staff In-service day. Regular library hours will resume Tuesday, September 24.

Archive Search Results


Showing 1 - 2 of 2 , query time: 0.01s
Thumbnail for 'Spring runoff in Red Cliff'
Format:
Image
Water from Turkey Creek floods the grounds of the Fleming Lumber and Mercantile Co. during June 1952. Spring runoff was high.
Thumbnail for 'Eagle Lumber Co. loading shed'
Format:
Image
The Eagle Lumber Co. loading shed for the Denver & Rio Grand railroad at Peterson Creek gulch in the Eagle River Canyon (about .5 mi. from Red Cliff and 2 mi. from Belden). The logs were sent down on the surface tram running down the gulch in this photo and then loaded on train cars. There is another set of main line tracks across the Eagle River (at the bottom of the photo). The small building at the right is the tram house. Above that, there...