Showing
1 - 2
of 2
, query time: 0.01s
Format:
Image
A surface tram used to move ore and equipment is on the left coming into Belden from Gilman at the top. Loading tippel, steam room and the dryer buildings are pictured in the lower right.
Format:
Image
Moving the zinc dryer from a railroad car into the dryer building at Belden. A wall section approximately 60 feet long has been removed in the dryer building to move this equipment
into the facility.