All Eagle Valley Library District locations will be closed on Monday, May 27, 2024 in observance of Memorial Day. Regular library hours will resume Tuesday, May 28, 2024.


Showing 1 - 2 of 2 , query time: 0.05s
Cover Image
Format:
Image
1930s: Rio Grande Railroad crane dropping section of bridge span into place, guided by men at either end of the span. Eagle River visible at left (Eagle, Colorado). "The Rio Grande Railroad began construction of the steel railroad bridge at Eagle in 1934." -- Those Were the Days, EVE Jan. 22, 2004 p.2 [Title supplied from catalog prepared by the Eagle County Historical Society.]
Cover Image
Format:
Image
1934: Rio Grande Railroad crane dropping section of bridge span into place. Men at either end of the span are waiting to assist the crane.. Eagle River visible in foreground (Eagle, Colorado).