Archive Search Results
Showing
1 - 20
of 26
, query time: 0.01s
2. Gilman
5. Gilman
7. Drilling
8. Gilman
12. Mitchell Sets
14. Assay office
16. Timber truck
17. Mine stope
Format:
Image
Steve Rich unloading mining timber at the bottom of the main shaft, level 16. The mining timbers were loaded vertically by the surface crew to fit the main cage that transported them down into the mine. A timber truck can be seen in the foreground and a "stern" warning sign is in the background.