Showing 1 - 20 of 59 , query time: 0.01s
Cover Image
Format:
Image
Bill Burnett clamping 4" x 6" x 3/8" heavy angle iron and 1/2" plates into an exact postiton prior to welding. This will make a base for a battery charging generator in one of the mine charging stations.
Cover Image
Format:
Image
Bob Enzenroth repairing and overhauling a jackhammer. All rock drills not working properly were sent to the machine shop to be cleaned, repaired and returned to the mine for service.
Cover Image
Format:
Image
Bob Radabaugh, mine geologist, at the Gilman Mine. The geologists determined areas of optimum ore yield through various methods of inquiry. Bob is shown with one of the low tech methods, the rock hammer, checking the rock formation.
Cover Image
Format:
Image
Carl Garner reconstructing a mine hoist used for moving ore and supplies in the mine.
Cover Image
Format:
Image
Lime, soda ash and copper sulfate (used in the zinc ore processing) stored beneath the mill at Gilman. Tracks used by timber trucks and ore cars run down the center of the picture. [Same as 2007.008.123]
Cover Image
Format:
Image
Staging area in the mill at Gilman for the chemicals used to process the mined ore. The fork lift was used to lift pallets of the chemicals for use in the mixing machines. [Similar to 2007.008.072]
Cover Image
Format:
Image
The cyanide injecting machine inside the mill at Gilman. Cyanide was used to clean the ore for processing. A pressure gauge is seen at the top of the injectors.
Cover Image
Format:
Image
Cyanide mixing machine in the mine at Gilman. Cyanide was shipped to the mine in 50 gallon drums and required the use of rubber gloves in handling.
Cover Image
Format:
Image
Drilling prior to adding dynamite to blast a section for mining at Gilman. Protective clothing was worn to keep the driller from being injured by debris, but we see no eye safety wear.
Cover Image
Format:
Image
Ed Koch starting the repair and reconditioning of a rocker dump mine car. This mine car has become unserviceable since the bottom and end are worn through. The car will receive new steel section plates and be completely reconditioned.
Cover Image
Format:
Image
Emmet Flaherty preparing to pre-heat two blank pieces of hollow drill steel. In the background is an automatic oil-fired forge which will bring these blanks to an exact temperature for forging. From the hollow drill blanks, finished pieces of lugged steel are formed for use in rock drills.
Cover Image
Format:
Image
Secondary or fine crusher used in the milling process at Gilman.
Cover Image
Format:
Image
Secondary or fine crusher in the Gilman Mine.
Cover Image
Format:
Image
Floation area for the zinc ore at Gilman. Flotation tables were used to seperate the zinc and lead from the waste in the mining process. Further processing separated the lead and the zinc.
Cover Image
Format:
Image
Flotation area for the zinc ore. Water valves are shown at the bottom of the table.
Cover Image
Format:
Image
Flotation stations in the zinc section of the mill at Gilman. The flotation stations were part of the process of refining the zinc ore.
Cover Image
Format:
Image
Closeup of the flume used to dump "muck' onto the conveyor. This conveyor carried the ore to a series of crushing machines. Conveyors were used extensively in the mine. [related to photo 2007.008.090]
Cover Image
Format:
Image
Tommy Reed repairing a foot valve for one of the mine pumps at the Gilman Mine.
Cover Image
Format:
Image
Cable used to raise forge door.
Cover Image
Format:
Image
Fork lift loading soda ash onto a platform for use in the soda ash machine. The fork lift was battery operated.