Showing
81 - 86
of 86
, query time: 0.05s
Format:
Image
Men jockeying the new dryer from the flatbed rail car to the dryer building.
Format:
Image
Conveyor unloading zinc from the dryer at Belden. The zinc was then taken to the loading tippel to be loaded on railcars. Durbin McIlnay is monitoring the process.
Format:
Image
Supply warehouse at Belden. Supplies came by rail through the Eagle River canyon and went into this warehouse. Robert E. Riggle worked here.
84) Zinc dryer
Format:
Image
The dryer building for zinc is at the far right. The zinc slurry would be heated and dried, leaving a very fine zinc powder. The powder was shipped in sealed box cars as it was so fine it would blow away in an open car. The rail line for shipping runs through the Eagle River Canyon (Belden area) so the final products for shipping were finished at this level.
Format:
Image
Moving the zinc dryer from a railroad car into the dryer building at Belden. A wall section approximately 60 feet long has been removed in the dryer building to move this equipment
into the facility.