Showing 1 - 20 of 59 , query time: 0.01s
Cover Image
Format:
Image
Dick Sayers (left) and John Skinner discussing the adjustments to equipment. A good view of the headlamp attachment to the battery pack carried on one's belt.
Cover Image
Format:
Image
Dick Sayers (left) and John Skinner adjusting the valves on equipment.
Cover Image
Format:
Image
Dick Sayers (left) and John Skinner adjusting the valves on equipment.
Cover Image
Format:
Image
[Title supplied from catalog prepared by the Eagle County Historical Society.]
Cover Image
Format:
Image
Belden as seen from Gilman. On the left are the loading tippel, steam room and dryer. Loading tippel is extended over the railroad cars to be filled with ore. A surface tram carrying ore ready for loading is visible behind the loading tippel.
Cover Image
Format:
Image
Belden as seen from Gilman. On the left are the loading tippel, steam room and dryer. Loading tippel is extended over the railroad cars to be filled with ore. A surface tram carrying ore ready for loading is visible behind the loading tippel.
Cover Image
Format:
Image
Blasting caps and cord station.
Cover Image
Format:
Image
Lime, soda ash and copper sulfate (used in the zinc ore processing) stored beneath the mill at Gilman. Tracks used by timber trucks and ore cars run down the center of the picture. [Same as 2007.008.123]
Cover Image
Format:
Image
Staging area in the mill at Gilman for the chemicals used to process the mined ore. The fork lift was used to lift pallets of the chemicals for use in the mixing machines. [Similar to 2007.008.072]
Cover Image
Format:
Image
The cyanide injecting machine inside the mill at Gilman. Cyanide was used to clean the ore for processing. A pressure gauge is seen at the top of the injectors.
Cover Image
Format:
Image
Dick Sayers (l) and John Skinner (r) at the pumping station on 20 level at Gilman. "Water for the mine came directly from the Eagle River from the pump house, which was just across the ramp coming down the mill incline. About 50 tons of ore per hour went through the mill during each eight-hour shift." Eagle River Valley, p.38
Cover Image
Format:
Image
Ed Koch starting the repair and reconditioning of a rocker dump mine car. This mine car has become unserviceable since the bottom and end are worn through. The car will receive new steel section plates and be completely reconditioned.
Cover Image
Format:
Image
Ed Koch starting the repair and reconditioning of a rocker dump mine car. This mine car has become unserviceable since the bottom and end are worn through. The car will receive new steel section plates and be completely reconditioned.
Cover Image
Format:
Image
Dick Sayers (left) and John Skinner, examining ore in the ore cars. Both men are wearing headlamps.
Cover Image
Format:
Image
Dick Sayers (left) and John Skinner, closely examining ore in the ore cars. Both men are wearing headlamps.
Cover Image
Format:
Image
Secondary or fine crusher used in the milling process at Gilman.
Cover Image
Format:
Image
Secondary or fine crusher in the Gilman Mine.
Cover Image
Format:
Image
Floation area for the zinc ore at Gilman. Flotation tables were used to seperate the zinc and lead from the waste in the mining process. Further processing separated the lead and the zinc.
Cover Image
Format:
Image
Floation area for the zinc ore at Gilman. Flotation tables were used to seperate the zinc and lead from the waste in the mining process. Further processing separated the lead and the zinc.
Cover Image
Format:
Image
Flotation area for the zinc ore. Water valves are shown at the bottom of the table.