Showing
1 - 4
of 4
, query time: 0.01s
Format:
Image
The Belden mill and tram in Eagle Canyon, below Gilman. Railroad tracks at bottom right in photo. Taken after the 1919 landslide.
Format:
Image
Belden as seen from Gilman. On the left are the loading tippel, steam room and dryer. Loading tippel is extended over the railroad cars to be filled with ore. A surface tram carrying ore ready for loading is visible behind the loading tippel.
Format:
Image
Belden as seen from Gilman. On the left are the loading tippel, steam room and dryer. Loading tippel is extended over the railroad cars to be filled with ore. A surface tram carrying ore ready for loading is visible behind the loading tippel.
Format:
Image
Moving the zinc dryer from a railroad car into the dryer building at Belden. A wall section approximately 60 feet long has been removed in the dryer building to move this equipment
into the facility.