Showing 41 - 46 of 46 , query time: 0.01s
Cover Image
Format:
Image
A compressed air-driven mucking machine at Gilman. The bucket has just been dumped into the ore car behind and is preparing to recover and pick up another load of ore.
Cover Image
Format:
Image
Belden as seen from Gilman. On the left are the loading tippel, steam room and dryer. Loading tippel is extended over the railroad cars to be filled with ore. A surface tram carrying ore ready for loading is visible behind the loading tippel.
Cover Image
Format:
Image
New dryer being put in place at Belden. Drying fins are seen in the inside of the dryer.
Cover Image
Format:
Image
Moving the zinc dryer from a railroad car into the dryer building at Belden. A wall section approximately 60 feet long has been removed in the dryer building to move this equipment into the facility.
Cover Image
Format:
Image
Moving a dryer section into place by blocking and chaining. Small sections pf pipe were also used to move the dryer.
Cover Image
Format:
Image
Section of the zinc dryer being fitted into place at Belden. Chains and blocks are used to move the equipment into the building.