All Eagle Valley Library District locations will be closed on Sunday, March 31. Regular library hours will resume Monday, April 1​.

Supplemental environmental analysis, 230 kV Wolcott-Malta transmission line.
(Book)

Description
Description not provided
Also in This Series
Copies
Location
Call Number
Status
EVLD Eagle Colorado Books
REF 621.319 SUP
Library Use Only
More Like This
More Details
Physical Desc:
205 leaves in various foliations : diagrams, maps (some color) ; 29 cm
Language:
English

Notes

General Note
At head of title: Yampa Project.
General Note
"Presented by Colorado-Ute Electric Association, Inc."
General Note
"January 1979."
General Note
Appendix 1 to Wolcott-Malta, Colorado, 230 kV transmission line and related terminal facilities, draft supplement to the Yampa Project final environmental statement by U.S. Rural Electrification Administration, and to Wolcott-Malta, Colorado (Wolcott-Basalt 230 kV and Basalt-Malta 345 kV) transmission lines and related terminal facilities, final supplement to the Yampa Project final environmental statement by U.S. Rural Electrification Administration.
Bibliography
Includes bibliography.
Citations
APA Citation (style guide)

(1979). Supplemental environmental analysis, 230 kV Wolcott-Malta transmission line. [Place of publication not identified], [publisher not identified].

Chicago / Turabian - Author Date Citation (style guide)

1979. Supplemental Environmental Analysis, 230 KV Wolcott-Malta Transmission Line. [Place of publication not identified], [publisher not identified].

Chicago / Turabian - Humanities Citation (style guide)

Supplemental Environmental Analysis, 230 KV Wolcott-Malta Transmission Line. [Place of publication not identified], [publisher not identified], 1979.

MLA Citation (style guide)

Supplemental Environmental Analysis, 230 KV Wolcott-Malta Transmission Line. [Place of publication not identified], [publisher not identified], 1979.

Note! Citation formats are based on standards as of July 2022. Citations contain only title, author, edition, publisher, and year published. Citations should be used as a guideline and should be double checked for accuracy.
Staff View
Grouped Work ID:
0139262f-8ec3-5979-f8ae-a98f369f85d9
Go To GroupedWork

Record Information

Last Sierra Extract TimeFeb 08, 2024 08:01:27 PM
Last File Modification TimeFeb 08, 2024 08:02:00 PM
Last Grouped Work Modification TimeFeb 08, 2024 08:01:33 PM

MARC Record

LEADER02662nam a2200445Ii 4500
0016906740
003UNKNOWN
00519860809141955.0
008801106s1979    xxuab    b   f000 0 eng d
040 |a COF|b eng|c COF|d m.c.|d COG
049 |a COF|c COF|d m.c.|d COG
092 |a COLO|b REF, 621.319, SUP
24500|a Supplemental environmental analysis, 230 kV Wolcott-Malta transmission line.
2463 |a Wolcott-Malta transmission line
2463 |a Yampa Project
264 1|a [Place of publication not identified] :|b [publisher not identified],|c [1979]
300 |a 205 leaves in various foliations :|b diagrams, maps (some color) ;|c 29 cm
336 |a text|b txt|2 rdacontent
337 |a unmediated|b n|2 rdamedia
338 |a volume|b nc|2 rdacarrier
500 |a At head of title: Yampa Project.
500 |a "Presented by Colorado-Ute Electric Association, Inc."
500 |a "January 1979."
500 |a Appendix 1 to Wolcott-Malta, Colorado, 230 kV transmission line and related terminal facilities, draft supplement to the Yampa Project final environmental statement by U.S. Rural Electrification Administration, and to Wolcott-Malta, Colorado (Wolcott-Basalt 230 kV and Basalt-Malta 345 kV) transmission lines and related terminal facilities, final supplement to the Yampa Project final environmental statement by U.S. Rural Electrification Administration.
504 |a Includes bibliography.
650 0|a Overhead electric lines|x Environmental aspects|0 https://id.loc.gov/authorities/subjects/sh2008008261|z Colorado.|0 https://id.loc.gov/authorities/names/n80125532-781
7102 |a Colorado-Ute Electric Association.|0 https://id.loc.gov/authorities/names/n84219893
7101 |a United States.|b Rural Electrification Administration.|t Wolcott-Malta, Colorado, 230 kV transmission line and related terminal facilities, draft supplement to the Yampa Project final environmental statement.
7101 |a United States.|b Rural Electrification Administration.|t Wolcott-Malta, Colorado (Wolcott-Basalt 230 kV and Basalt-Malta 345 kV) transmission lines and related terminal facilities, final supplement to the Yampa Project final environmental statement.
902 |a 060713
907 |a .b11622283
948 |a MARCIVE Comp, in 2022.12
948 |a MARCIVE Comp, 2018.03
948 |a MARCIVE August, 2017
948 |a MARCIVE extract Aug 5, 2017
989 |1 .i12628785|b 1060000227618|d eveco|g o|m |h 0|x 0|t 0|i 0|j 78|k 010628|o p|a REF|a 621.319|r SUP
995 |a Loaded with m2btab.ltiac in 2022.12
995 |a Loaded with m2btab.ltiac in 2018.03
995 |a Loaded with m2btab.ltiac in 2017.09
998 |e -|f eng|a ev|a eve